Sunday, August 3, 2014

LONG TERM IMPRECISION: HOW TO CALCULATE


Introduction

            The monitoring of long term laboratory imprecision is very important for patient management, especially in the follow up for the response to treatment based on the laboratory data. Currently, the long term imprecision is based on the combination of the intermediate CV as CV= √ (CV12+CV22+ CV32 +….). This formula provides bigger CV  compared to the generated CV by the analyzer for the same duration.

            The aim of this study is to determine alternative method in calculation for the long term imprecision compared to the generated CV in the same duration.

Method

            The Albumin quality control data, Level 1 and Level 2 on the Architect c8000 analyzer for six months ( July, August, September, October, November and December  2012) were used in this study. The analyzer generated the mean, SD and CV for the last six months duration and on monthly basis (July to December respectively). The monthly mean, SD and CV were entered in the excel work sheet for calculation of the long term imprecision in two methods:

i.                    Based on the combination of monthly CV and

ii.                  Based on the combination of the monthly variance.

The value of the total CV obtained in the above method was compared to the generated CV for the last six month (July to December).    

Results

            The results from the experiment are as the  following :

1.                 Automated generated  Total CV by the analyzer for the duration of July to December
 
LEVEL 1
LEVEL 2
N
MEAN (g/l)
SD
% CV
N
MEAN ( g/l)
SD
% CV
July to Dec
231
40.54
0.827
2.04
234
24.7
0.61
2.46

 2.         Monthly data (July to December)

MONTH
N
LEVEL 1
LEVEL 2
MEAN (g/l)
SD
CV
MEAN
SD
CV
JULY
2
41
0
0.00%
24.5
0.707
2.89%
AUGUST
57
40.54
0.569
1.40%
24.745
0.440
1.78%
SEPT
57
39.72
0.526
1.32%
24.18
0.563
2.33%
OCT
54
40.333
0.476
1.18%
24.91
0.446
1.79%
NOV
52
41.481
0.504
1.22%
25.245
0.434
1.72%
DEC
9
41.556
0.527
1.27%
25.111
0.333
1.33%

 3.         Imprecision calculation
       

Imprecision calculation (six month)
Level  1 QC
Level 2 QC
Based on the monthly CV
2.86%
4.99%
Based on the monthly Variance
2.04%
2.46%
Automated generated by analyzer (six month)
2.04%
2.46%
      

The results showed that CV generated by automated analyser based on the QC data July to December were 2.04% for level 1 and 2.46% for level 2. The CV calculated based on the combination of monthly CV from July to December on the same QC data were 2.86% for level 1 and 4.99% for level 2. On the other hand, when the CV is calculated based on the combination of monthly variance on the same QC data, it was found that CV for level 1 was 2.04% and level 2 was 2.46%.

Conclusion

            Based on this study, it was found that the long term CV calculated based on the combination monthly variance gave  comparable result to that of  automatically generated CV  by the analyser where as combination of the monthly CV gave much bigger CV. Therefore, it can be concluded that the CV calculated by monthly variance is more reliable compared to the combination of the monthly CV.  

No comments:

Post a Comment